How to write a quote as a tradie in Australia
Updated 9 October 2026
Short answer
A good tradie quote has nine things: your business name and ABN, the customer and the job address, a clear scope (what's included and what isn't), itemised labour and materials, GST shown properly, the total, how long the price holds, the deposit and payment terms, and an easy way to say yes.
The biggest win isn't the template, it's speed. Send the quote the same day, ideally before you leave the driveway.
Quote or estimate? Say which one you're giving
A quote is a fixed price for the work you've described. Once the customer accepts it, that's the price. An estimate is your best guess and can change. Customers treat anything called a quote as a promise, so only call it a quote when you're confident about the scope. If there's a real unknown (what's behind the wall, how bad the rot is), quote what you can see, say what isn't covered, and say how you'll price it if you find it.
What to put on every quote
- Your details: business name, ABN, phone, email, and your licence number if your trade needs one.
- The customer and the site: name, contact details and the job address (it's often not the billing address).
- Scope of work: what you'll do, in plain words. Add a line for what's not included, like making good, rubbish removal or council fees. Most disputes start here.
- Itemised prices: labour and materials as separate lines. Customers trust a broken-down price more than one big number.
- GST: if you're registered, show the GST amount or say the total includes GST. If you're not, don't add it.
- Total: the amount the customer will actually pay.
- Validity: an expiry date, usually 30 days.
- Deposit and payment terms: how much is due up front, when the balance is due, and how they can pay.
- How to accept: a signature, a reply, or better, a link they can tap to accept.
Example: a small bathroom job
Here's how the numbers on a simple quote look for a GST-registered tradie. Line prices are shown excluding GST, with GST added at 10% at the bottom.
| Item | Qty | Price (ex GST) |
|---|---|---|
| Remove and dispose of old vanity | 1 | $220.00 |
| Supply and install 900mm vanity (supplied by us) | 1 | $1,150.00 |
| Plumbing connections and testing | 1 | $380.00 |
| Labour, second-fix and clean-up (hours) | 4 | $440.00 |
| Subtotal | $2,190.00 | |
| GST (10%) | $219.00 | |
| Total (inc GST) | $2,409.00 |
Then add the terms: "Price valid 30 days. 20% deposit ($481.80) to book the job, balance on completion. Not included: tiling repairs behind the old vanity, if needed."
Deposit limits for residential building work
If the job counts as residential building work, your state caps the deposit you can take. These are the limits as of October 2026:
| State | Maximum deposit | Notes |
|---|---|---|
| NSW | 10% | Written contract needed over $5,000 (inc GST). Where home building compensation cover is required, it must be in place before you ask for a deposit. |
| Victoria | 10% under $20,000; 5% at $20,000 or more | Insurance must be provided before taking money on work over $16,000. New laws start 31 March 2027 and are expected to change these limits. |
| Queensland | 20% up to $3,300; 10% from $3,301 to $19,999; 5% from $20,000 | Written contract needed over $3,300. |
| WA | 6.5% | Applies to home building contracts from $7,500 to $500,000. |
| SA | 5% on contracts of $20,000 or more | Check Consumer and Business Services for smaller jobs; the regulations were replaced on 1 September 2026. |
Getting more quotes accepted
- Send it the same day. The tradie who quotes first often wins, because the customer stops looking.
- Make yes easy. A quote they can accept from their phone gets answered faster than a PDF they have to print and sign.
- Take the deposit at acceptance. It locks the job in and covers your materials.
- Follow up once, two or three days later. A short "any questions about the quote?" is enough.
- Offer options for bigger jobs. A good, better and best version lets the customer choose instead of comparing you to someone cheaper.
Changes once the job has started
If the customer asks for extra work, or you find something that wasn't in the scope, stop and agree the change in writing first: what the extra work is and what it costs. A text or email they reply "yes" to beats an argument at invoice time.
Doing it from your phone
You don't need a desktop and a Word template. Most tradie quoting apps let you build a quote on site from saved items, add GST automatically and send it by text or email. In Jobbit, the customer gets a link where they can read the quote, accept it and pay a deposit by card. You then turn the accepted quote into a job, and the job into an invoice, without retyping the items. There's a free plan if you want to try it on your next few quotes.
FAQ
Is a quote legally binding in Australia?
Yes, once the customer accepts it, a quote becomes a binding contract for the work it describes. An estimate is a rough guide and isn't binding. If the job changes, get the customer's agreement to the extra work and price before you do it.
Do I have to show GST on a quote?
Prices for consumers must be shown as a single total that includes GST and any unavoidable fees. If you're registered for GST, show that total and the GST amount. If you're not registered, don't add GST at all.
How long should a quote be valid for?
Thirty days is common. Shorter is fine when material prices move quickly. Put the expiry date on the quote so there's no argument about an old price.
Can I charge for a quote?
Yes, if you tell the customer before you visit. Some tradies charge a call-out or measure-up fee and take it off the job price if the quote is accepted.
Should I ask for a deposit?
For jobs with big material costs, yes. Put the deposit amount and when it's due on the quote. For residential building work, each state caps the deposit: 10% in NSW, 5% to 10% in Victoria and Queensland depending on the contract price, 6.5% in WA and 5% in SA for contracts of $20,000 or more.
Do I have to pay a call-out fee that wasn't in the quote?
From the customer's side, WA Consumer Protection's guidance is that a call-out fee left out of the quote doesn't have to be paid. So if you charge one, put it on the quote.
Sources
Rules summarised from business.gov.au, state fair trading and building regulators and the ACCC, checked 9 October 2026. This is general information, not legal advice. Deposit rules for building work depend on your state, your licence and the contract, so check with your regulator.
- business.gov.au: prepare quotes
- ACCC: price displays (total price rule)
- WA Consumer Protection: estimates, quotes and deposits
- NSW: home building contracts
- Victoria (BPC): agreements and contracts
- Queensland (QBCC): deposits and progress payments
- WA Building and Energy: building or renovating your home
- SA: builder responsibilities
Give Jobbit a go — the free plan costs nothing
Quote it, book it, invoice it, get paid — all from your phone. No card required to start.